Certificate document
pending
Quality management system
Process control for incoming components, assembly and final electrical test on resistance welding power sources and special machines.
Certificate document pending
Quality & cases
We publish a document only when the current file is on hand. Where a certificate is still being prepared, the page says so instead of showing a placeholder seal. The cases below describe how a process was chosen — they are application examples, not customer endorsements.
Documentation
Certificate document
pending
Process control for incoming components, assembly and final electrical test on resistance welding power sources and special machines.
Certificate document pending
Certificate document
pending
Electrical safety and EMC documentation prepared per machine model for the destination market.
Certificate document pending
Certificate document
pending
Packing list, commercial invoice and shipping records issued per shipment.
Issued per order
Ask the export desk for the current document set before a tender submission. Documents are issued per destination market where the file exists.
Application examples
Application exampleAutomotive parts
SY-MFDC 100 spot welder
Closed-loop current control held nugget size inside the peel-check window as electrode tips wore through the shift, so the schedule did not need re-tuning mid-run.
Application exampleHome appliances
SY-PRO 160 with SY-NF 8 feeder
Nut placement and projection welding run as one interlocked cycle, removing a manual loading step and keeping nut position repeatable.
Application exampleRadiators
SDM-60 seam welder
Constant roller travel speed and programmed pressure produced a continuous seam along the panel length, with pressure set to limit marking on the visible face.
How we work
Tests are run at the four checkpoints below on every machine before packing. The order sequence is the same for a single unit and for a mixed container.
01
Share the material, sheet thickness, weld points per part and cycle time. Drawings or photos are welcome.
02
We propose a machine, gun and spares set, with the parameters that change if your material does.
03
Sample welding or a video demonstration on your material before the order is confirmed.
04
Packing list, commercial invoice and shipping records are issued per order.
Next step
Tell us the market you are supplying and the process you run, and the reply will match that context.